This is our music video time sheet. This shows you and helps us to know what goes on minute by minute. I really enjoyed doing this and think it really helped us to understand what will be needed to do to complete my video.
THIS IS ANOTHER RISK ASSESSMENT !!
OUR STORY BOARDS
Genral risk assessment
Activity/
Location
|
Music video within Gateshead college
|
DATE
|
17/01/2014
|
Name & Title
of assessor
|
Gary Collinson
|
1. Detailed
Description of Activity/ Process
Including
frequency of
repetition
|
We are going to video some clips inside of college using the drama theatre as we gained acsess to use it.
|
1. Detailed
Description of Activity/ Process
Including
frequency of
repetition
|
We are going to video some clips inside of college using the drama theatre as we gained acsess to use it.
| ||||
2. List of significant hazards encountered - more detail will be required in Q5, flammable gases, electrical / mechanical, confined space, etc
|
Specialised risk ass’t required?
|
Risk ass’t ref no.
| |||
e.g. working at height (Fall from height whilst working on refuse vehicle roof (no controls)
| |||||
Slipping hazards
|
No
|
-
| |||
Falling Hazzards
|
No
|
-
| |||
Being injured from the karate moves
|
No
|
-
| |||
Damaging the equipment
|
No
|
-
| |||
3. Adverse effects
(likely injury)
without control
measures
|
No
|
-
| |||
4.Persons at risk
and numbers
where practical
|
4, Me, Demi, Bethan, Matthew, Jack and Asha
|
6. ACTION / CONTROL MEASURES REQUIRED
| |||
Apply hierarchy of controls e.g. Eliminate, Substitute, Control risk at source, Safe System of Work (monitoring), Training, PPE.
|
By Whom /Action Record Referece1
|
Target
Date
|
Completed
Date
|
e.g.1 Provide ‘Safeman’ system for working on vehicle roof.
e.g.2 Prevent access in the meantime.
|
1
|
Make sure there is no slip hazzards
|
Team
|
17/01/2014
|
17/01/2014
|
2
|
Take care when filming and performing
|
Team
|
17/01/2014
|
17/01/2014
|
3
|
Pose the karate moves
|
Team
|
17/01/2014
|
17/01/2014
|
4
|
Take Extra care with video equipment
|
Team
|
17/01/2014
|
17/01/2014
|
Date to review this risk assessment
|
When actions completed the responsible Director or Assistant Director will sign off as confirmation that risks have been reduced as far as is reasonably practicable.
| ||
17/01/2014
|
Gary Collinson
|
17/01/2014
|
THIS IS ANOTHER RISK ASSESSMENT !!
Activity/
Location
|
Music video Outside of college
|
DATE
|
17/01/2014
|
Name & Title
of assessor
|
Gary Collinson
|
1. Detailed
Description of Activity/ Process
Including
frequency of
repetition
|
We are going to video some clips outside on the millennium bridge to include in our video to showed we have used different locations for effect in the video. We are going to be doing karate movies for the video so could cause some injuries
|
2. List of significant hazards encountered - more detail will be required in Q5, flammable gases, electrical / mechanical, confined space, etc
|
Specialised risk ass’t required?
|
Risk ass’t ref no.
| ||
e.g. working at height (Fall from height whilst working on refuse vehicle roof (no controls)
| ||||
Obstructing the public
|
No
|
-
| ||
Falling over on concrete
|
No
|
-
| ||
Road Hazzards
|
No
|
-
| ||
Being injured from the karate moves
|
No
|
-
| ||
Damaging the equipment
|
No
|
-
| ||
3. Adverse effects
(likely injury)
without control
measures
|
Broken props, equipment and physical injury to group members
|
4.Persons at risk
and numbers
where practical
|
4, Me, Demi And Asha
|
6. ACTION / CONTROL MEASURES REQUIRED
| ||||
Apply hierarchy of controls e.g. Eliminate, Substitute, Control risk at source, Safe System of Work (monitoring), Training, PPE.
|
By Whom /Action Record Referece1
|
Target
Date
|
Completed
Date
| |
e.g.1 Provide ‘Safeman’ system for working on vehicle roof.
e.g.2 Prevent access in the meantime.
| ||||
1
|
Wait for public to pas
|
Team
|
17/01/2014
|
17/01/2014
|
2
|
Take care when doing stunts
|
Team
|
17/01/2014
|
17/01/2014
|
3
|
Use the traffic lights to cross busy roads
|
Team
|
17/01/2014
|
17/01/2014
|
4
|
Pose the karate moves
|
Team
|
17/01/2014
|
17/01/2014
|
5
|
Take Extra care with video equipment
|
Team
|
17/01/2014
|
17/01/2014
|
Date to review this risk assessment
|
When actions completed the responsible Director or Assistant Director will sign off as confirmation that risks have been reduced as far as is reasonably practicable.
| ||
17/01/2014
|
Signature G.collinson
Print name: Gary Collinson
|
Date
17/01/2014
|
OUR STORY BOARDS
Bethan, a good range of pre-production documentation uploaded for your group project, with an explanation of their purpose and how they factor into your video production.
ReplyDelete